Assigned to:  siron Percent Complete:  90%
Open/Closed:  Closed Planned Release:  CERTI 3.3.2
RTI Service Groups:  Time Management

Jump to the original submission

Wed 29 Apr 2009 09:41:39 AM UTC, comment #8: 

Should now be OK in CERTI 3.3.2,
there is a corresponding test in HLA Testsuite too
using Interactive_Federate from Pierre

Eric NOULARD <erk>
Group administrator
Fri 03 Apr 2009 01:08:51 PM UTC, comment #7: 

I do add Martin and JB as cc
since they may want to monitor this topic too.

Eric NOULARD <erk>
Group administrator
Thu 02 Apr 2009 08:23:45 PM UTC, comment #6: 

I do re-switch the task as "In Progress"
because the usage of approximate floating arithmetic
introduction used for fixing  bug:
https://savannah.nongnu.org/bugs/?23090

may have broken previously working TARA/NERA.
I'm really sorry about that.
As soon as TARA/NARA work again I'll put a test
(with the help of Pierre) in the
HLA_TestSuite in order to ensure it won't be broken again.

In the same way the fix of
https://savannah.nongnu.org/bugs/?24930

have duplicated the FedTime class in order to make
it reside in its own libFedTime.

Please update your CERTI CVS tree before going-on on this.

Eric NOULARD <erk>
Group administrator
Wed 02 Jul 2008 09:10:45 AM UTC, comment #5: 

TARA and NERA has been since CERTI 3.2.6
but we need to add a HLA_TestsSuite module for it.

Eric NOULARD <erk>
Group administrator
Sun 23 Mar 2008 11:36:16 AM UTC, comment #4: 

Pierre
I did release CERTI 3.2.6 yesterday using
CVS Head as planned.

If TARA and NERA is done may you close the task?
If not may be add a comment in the tracker for missing feature?

Eric NOULARD <erk>
Group administrator
Thu 13 Mar 2008 04:24:08 PM UTC, comment #3: 

Implementation reference:
"Zero lokahead and repeatability in the High Level Architecture"
Richard M. Fujimoto
1997 Spring Simulation Interoperability Workshop

Pierre Siron <siron>
Group administrator
Thu 28 Feb 2008 09:18:36 PM UTC, comment #2: 

I suppose you talk about these two papers:

Fujimoto:
http://www.informs-sim.org/wsc97papers/0373.PDF

Liu
http://www.informs-sim.org/wsc07papers/070.pdf

I found also another interesting document:
http://www.ecst.csuchico.edu/~hla/LectureNotes/TimeManagement2.pdf

(The whole directory contains a lot of interesting stuff
http://www.ecst.csuchico.edu/~hla/LectureNotes)

The author is also Fujimoto and there he talks about time management too. The ideas and concepts are explained in
detail. Also TARA and NERA are discussed (page 24 ff).

I've some small experiences with sync algoritms. I programmed
some conservative sync schemes (CBM, DDAR and some synchronous schemes) with Matlab on basis of PVM. We use our Matlab PVM toolbox for such purposes it is called DP-Toolbox. 

So perhaps I could help here.

But at first I will read the literature you mentioned. The
publication of Liu was unknown to me.

A+
Christian

Christian Stenzel <approx>
Group Member
Wed 27 Feb 2008 09:56:06 AM UTC, comment #1: 

We could start by following the proposed implementation by Richard Fujimoto in his founder paper of 1997 Spring SIW.
After this first try, we should have a look to some optimizations,
that are feasible with the help of the RTIG (this central component is inactive with regard to the time management, it is just forwarding NULL messages) or to the proposal of Liu & al. (2006 Winter Simulation Conference) for example.
For very large scale federations, we postpone one more time the idea of building a network of duplicated RTIGs. For the moment, the solution will be to build interfederations.

Pierre Siron <siron>
Group administrator
Tue 15 May 2007 02:26:09 PM UTC, original submission:  

TARA and NERA are:

imeAdvanceRequestAvailable (const FedTime &)
nextEventRequestAvailable (const FedTime &)


we should analyse and (may be) implement thoses services.

Eric NOULARD <erk>
Group administrator

 

(Note: upload size limit is set to 16384 kB, after insertion of the required escape characters.)

No files currently attached

 

Depends on the following items: None found

Items that depend on this one: None found

 

Carbon-Copy List
  • -email is unavailable- added by erk (Intérêt général sur le time management)
  • -email is unavailable- added by erk (Pour lien avec gestion du Lookahead)
  • -email is unavailable- added by approx (Posted a comment)
  • -email is unavailable- added by siron (Posted a comment)
  • -email is unavailable- added by erk (Submitted the item)
  •  

    There are 0 votes so far. Votes easily highlight which items people would like to see resolved in priority, independently of the priority of the item set by tracker managers.

     

    Follow 13 latest changes.

    Date Changed by Updated Field Previous Value => Replaced by
    2009-04-29 erk Priority1 - Later 5 - Normal
        StatusIn Progress Ready For Test
        Open/ClosedOpen Closed
        Planned ReleaseUnplannedRelease CERTI 3.3.2
    2009-04-03 erk Carbon-Copy- Added jbchaudron
    2009-04-03 erk Carbon-Copy- Added adele
    2009-04-02 erk StatusReady For Test In Progress
        Planned ReleaseCERTI 3.2.6 UnplannedRelease
    2008-03-23 erk Planned ReleaseNone CERTI 3.2.6
    2008-03-13 siron StatusDesign Ready For Test
        Percent Complete0% 90%
    2008-02-27 siron StatusNone Design
        Assigned toNone siron

    Back to the top

    Powered by Savane 3.13-0329.
    Corresponding source code